Block: CY-OS-90/1
Area:81 km2
Operator:
Hardy
Contractors:
Hardy 18%, ONGC 40%, HOEC 21%, TPPL 21%
Date of PSC singed :
30.12.94
ITEMS MINIMUM WORK PROGRAMME DURING EXPLORATION PERIOD
PHASE-I PHASE-II PHASE-III
Duration 120 Days from receipt of all data (i.e. till 31.5.1995)
1. RP/RI 2 seismic lines (55 LKM)
2. RP/RI 2591 LMK 3-D data
3. Conversion of logs + VSP data of 7 wells
4. Log evaluation of 7 Wells
5. Reservoir simulation to estimate minimum recoverable reserves
6. Detailed techno-economics of the various Development Plan options
7. Velocity-depth relationship for generating depth maps for 3-D data interpretation
 
WP