Block: AN-DWN-2002/2
Area:
12,495 km
2
Contractors:
ONGC,
Other Bids
: RIL90% HEPI 10%
ITEMS
MINIMUM WORK PROGRAMME DURING EXPLORATION PER
PHASE-I
PHASE-II
PHASE-III
DURATION
4 Years
2 Years
2 Years
RP+RI
500
1000
API
2500+1500 km
2
-
-
GM
100,000 stations
-
-
GOE-CHEM
500 Samples
-
-
SEA-BED
36 Samples
72 Samples
72 Samples
WELLS
1(2000 in 1501-2000 m)
2(1000 in 1501-2000 m,
3000 in 1501-2000 m )
2(3000 in 1501)