Block: MB-DWN-2000/1
Area: 11239 KM2
Operator:
ONGC
Contractors:
ONGC 85%, I0C 15%
Date of PSC singed:
117.7.2001, PEL: 31.7.01
ITEMS MINIMUM WORK PROGRAMME DURING EXPLORATION PERIOD
PHASE-I PHASE-II PHASE-III
DURATION 4 Years 2 Years 2 Years
RP+RI 1500 2000 1000
API 2D:2000
3D:1500
3D:500 NIL
WELLS 3(1 of 2500m in WD of 401-1000M;1 of 2000M IN WD 1001-1500M 1 of 1600M IN WD 2001) Same as in PHASE-I Same as IN PHASE-I